Samson G/Yohannes
Construction

Loading…

Storm water drainage project
/Projects/Storm water drainage project

Storm water drainage project

Jimma
Completed
Client
Jimma city administration
Contract Value
417,000 USD equvalent 64,635,000.00 ETB
Location
Jimma

Project Description

The Storm Water Drainage Project in Jimma City was executed to address urban flooding challenges and improve the city’s drainage infrastructure. The project plays a vital role in protecting roads, residential areas, and public facilities from water damage during heavy rainfall.

Our company successfully constructed a comprehensive storm water management system designed to ensure efficient water flow, reduce surface runoff, and enhance overall urban resilience.

The scope of work included:

• Construction of reinforced concrete drainage channels

• Installation of culverts and cross-drainage structures

• Earthworks, excavation, and backfilling

• Roadside drainage integration

• Erosion protection and slope stabilization works

• Site clearance and infrastructure improvement

The project was delivered in accordance with engineering standards, ensuring durability, functionality, and long-term performance.

Location: Jimma City, Oromia Region

Client: Jimma City Administration

This project demonstrates our capability in delivering critical urban infrastructure that supports sustainable city development and improves the quality of life for local communities.

Interested in Working With Us?

Contact us to discuss your construction project requirements